What is Difference between Safety stock and Reorder Level in SAP?

If a warehouse that stores material has to be ready for delivery at all times, then there has to be a high level of safety stock in this warehouse, as forecasting error cannot always be ruled out. This would also entail a high level of warehousing costs. The level of safety stock depends on the service level you select, on the replenishment lead time and on the accuracy of the forecast.

In order to keep the safety stock and therefore the storage costs as low as possible, the MRP controller usually specifies a service level for each material. From a mathematical point of view, the service level represents an organization’s ability to avoid a shortfall occurring during replenishment lead time. If you opt for a relatively high service level, then the safety stock level calculated by the system will also be high. If you opt for a low service level, then the stock level will also be low.

Safety stock and Reorder Point in SAP

The replenishment lead time refers to the in-house production time for in-house production and the planned delivery time for external procurement. It represents the time between the initiation of a procurement procedure and transferring the material into the warehouse. The replenishment lead time is stored at plant level in the material master record by the MRP controller. Since the probability of a shortfall is higher in a longer period, the safety stock level must also be set higher for long replenishment lead times.

Finally, the safety stock level also depends on the accuracy of the forecast. If the forecast deviates greatly from the actual consumption values, then the safety stock level will also be unusually high.


In addition to the safety stock level, the system recalculates the reorder level for materials which are subject to automatic reorder level adjustment. The reorder level is the sum of the safety stock and the forecast requirement within the replenishment lead time or the overall lead time for materials produced in-house.

The system compares “static” availability during material withdrawal; that is current availability, without taking future requirements into consideration, with the reorder level. In other words, it compares the remaining stock with the reorder level. If remaining stock falls below the level, then the system marks the material for the planning run by making an entry in the planning file. During the next planning run, the system automatically generates a purchase requisition or a planned order for the material.

Also See: What is Reorder Point Planning in SAP MM?

Online Training Tutorials

  • Reorder Point PlanningWhat is Reorder Point Planning in SAP MM?In the reorder point planning procedure, the system compares available warehouse stock with the reorder level. If available stock falls below the reorder level, an order proposal is […]
  • Bill of MaterialsConsumption Based Planning Process in SAP MM?The below SAP Tutorials help to know the consumption based planning procedures in detail. These are used in areas without in-house production and/or in production plants for planning both […]
  • Consumption Based Planning sap mmWhat is Consumption based Planning in SAP MM?The below sap mm tutorials (Material Management) will help to know more on the consumption based planning in sap mm. The central role of material requirements planning is to monitor stocks […]
  • SAP MM interview questionsSAP MM (Material Management) Interview QuestionsWe have listed some of SAP MM Interview Questions and Answers that have been designed for SAP MM professionals who are preparing interviews on SAP MM (Material Management). Here, we have […]
  • SAP Transport RequestWhat is Planned Order in SAP?The planned order shows a planned receipt for a particular material in a plant. Basically, it specifies when the receipt is to take place and the quantity of goods that is to be […]
  • materials planning and controlWhat is Materials Planning and Control?Materials planning and control determines how much of which material, component, goods etc. is needed and when. This activity is the responsibility of the materials planner or […]
  • SAP MM TutorialSAP MM Tutorial – Learn SAP Material Management OnlineSAP MM Tutorial - To learn some of the free SAP MM (Material Management) topics and how to deal material management and inventory management. SAP MM stands for Material Management and […]
  • SAP MM Transaction codesSAP MM Transaction Codes (Material Management)We can list of some of the SAP MM Transaction codes (Material Management) and the codes are help to provided in command field. The below list of important transaction codes are as […]